Contractor:
Van Wijnen DeventerRevenue:
€ 400.000,--Do you want to receive more information about this project or do you want a document for sharing? Click the button below to download a printer friendly PDF file.
Download Project Flyer
New construction of two stands at the Go Ahead Eagles stadium.
Two new stands were built at the Go Ahead Eagles stadium. Holcon supplied the walls, columns, beams, tribune elements and steps. The engineering was carried out by Bartels. Assembly by the contractor.
The projects we've worked on!