• icon_not_found

    Contractor:

    Dura Vermeer
  • icon_not_found

    Revenue:

    € 2.700.000

Do you want to receive more information about this project or do you want a document for sharing? Click the button below to download a printer friendly PDF file.

Download Project Flyer

Dupont Oegstgeest

Production and assembly of the entire hull, beams, columns and walls took care of. The construction steel, stairs, landings and hollow core slab floors are obtained from third parties. "Dupont" who did the engineering. For the Timelapse of this project: https://www.youtube.com/watch?v=FcyfXEzrBBo.

nieuwsbrief

Holcon, more than concrete

How can we help you?